TO: All Facilities Coordinators and Shutdown Group
FROM: Service Response Center
DATE: June 12, 2013
SUBJECT: Porter Hall A Level Flooring Work 6/14 through 6/17
Epoxy flooring work to re-coat the existing epoxy surface and repair the existing coated flooring at Porter Hall A Level Corridor nearest the North Porter exit into the Mall is currently scheduled to occur between Friday, June 14, at 5:00 pm through Monday, June 17, at 6:00 am. The entrance doors and corridor will be closed to pedestrian traffic during these dates and will be blocked off during critical curing times. The corridor will be open for emergency use only. Access to the following rooms is not available during this work A20, A21, A21A, A20A, A22, A23. Room A27 entrance door is on the very edge of this work which may be closed during the coating in this area, the coating will be performed in the evening hours. There will be a slight odor during the application of the material.
Some minor floor preparation work will occur after 9:30 PM on June 12 for approximately 2 hours. If you have any questions please contact Kyle Tomer at 8-6332 or e-mail kt2n@andrew.cmu.edu.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Kyle K. Tomer
Associate Director of FMS for Client Services
Facilities Management Services
Carnegie Mellon University
412-268-6332