Mon. Jan 19th, 2026

Facilities, Infrastructure and Risk Management (FIRM)
Facilities Management & Campus Services
 
TO:  Shutdown Group, Facility Coordinators
FROM:  Service Response Center
DATE:  October 21, 2020
SUBJECT: Fall 2020 Roofing Inspection Schedule for Campus
 
Please see below for the Fall 2020 Roofing Inspection Schedule for Campus. 
 
The dates listed are subject to change, due to weather conditions.
 
Monday 10/26   
WARNER HALL – Main
CYERT HALL – All
CIC – ALL
HAMERSCHLAG HALL

  • Main Roof-Main Tower
  • Main-Metal and Tee Wings
  • South Roof-Modified Green
  • North-B-Level
  • North-D-Level
SCAIFE HALL – All
ROBERTS HALL – All
SCOTT HALL – All
EAST CAMPUS GARAGE

  • Elevator
  • Stairwell
  • Press Box
ALUMNI HOUSE – All
BRAMER HOUSE AND GARAGE – All
TEPPER
 
Tuesday 10/27           
GYMNASIUM

  • A-Level & Event Level
  • B-C Levels
  • D-Levels 4-5-6-7-8-9
  • E-Level
POSNER CENTER – All
HUNT LIBRARY – Main
SMITH HALL – All
HAMBURG HALL – Main
NEWELL-SIMON HALL – Roofs 1-6
PHYSICAL PLANT – All
 
Wednesday 10/28 
COLLEGE OF FINE ARTS – All
MARGARET MORRISON

  • Main and Rotunda
  • L & R Third Floor Lower Concourse
  • Intelligent Building
POSNER HALL / HALL OF ARTS

  • A-B Roofs
  • C-D Roofs
  • E-G-I Roofs
  • F-Roof
300 S. CRAIG – All
UTDC – 4516 HENRY
INI -4616 HENRY
GATF BLDG – 4615 FORBES AVE
I I I – OLD BANK BUILDING
 
Thursday 10/29
WEAN HALL

  • Roofs A-B-F-H
  • Roofs C-D-E-G
  • Roofs K-L-M
DOHERTY HALL

  • Main and Tee Wings
  • A-Level Upper
  • A-Level Scanning Lab
  • C-Level Roof
  • Phase 1 Infill Roof
PURNELL CENTER – All
GATES/HILLMAN BLDG
MELLON INSTITUTE

  • 5th and 6th Floors
  • 7th Floor
  • 8th Floor
  • 9th Floor
S.E.I. – All
S.E.I – Garage Roof
407-409 S. CRAIG – All
205 S. CRAIG   
4612 HENRY
4618 HENRY
4620 HENRY
4721 FIFTH AVE
 
Friday 10/30    
ANSYS HALL
PORTER HALL

  • Main
  • B-Level Roofs
  • Roofs Above 220 Area
BAKER HALL – Main and Wings
COHON UNIVERSITY CENTER

  • Metal
  • Flat
PTC – All
6555 PENN AVE – All
WHITFIELD HALL

  • Main
  • Lower Flat Roofs
477 MELWOOD AVE- All
 
Please contact Lenny Libbon at 412-268-6148 or email LL1R@andrew.cmu.edu with any questions or concerns regarding the Fall Roofing Inspection Schedule.