CDFD will be excavating, repairing and replacing concrete at the front of Hunt Library from 7/19 – 7/30 from 6AM – 3PM daily.  This work will be weather permitting.

 

There will be minimal noise, disruptions and no total sidewalk closures during this work.  Access will be open, but limited at times, for material and equipment movement at the Baker Hall side of the main entrance.

 