Facilities, Infrastructure and Risk Management (FIRM)
Facilities Management & Campus Services
TO: Shutdown Group, Hamerschlag Hall
FROM: Service Response Center
SUBJECT: Hamerschlag Hall Chilled Water Shutdown
The chilled water system in Hamerschlag Hall will be shut down starting today, 11/14, to consolidate new chilled water bridges in conjunction with the F Level construction project.
The mechanical systems will be modified to utilize the colder temperatures to ensure building temperatures are kept in the same range through the building. The heating system will not be affected by this chilled water shutdown. Drawings are attached that show which areas are affected.
The chilled water system will be back on line by Friday, 11/18.
If you are in an area in the building that is experiencing warmer than normal temperatures, please contact CDFD Project Manager, Jan held, at jheld@cmu.edu or 412 527 5627.