Sat. Apr 19th, 2025
The planned power outages for the electrical maintenance work at Gates, Doherty and Prunell are a little over one month away (details below).  There will be an update meeting on Thursday, 4/17, at 11:30AM to receive feedback from affected departments and discuss the details of this shutdown.

Please send an email to Shannon Wetzel at swetzel@andrew.cmu.edu if you would like to be invited to this meeting.

On Wed, Feb 26, 2025 at 10:58 AM FMS Announce <fmsannc@andrew.cmu.edu> wrote:

Facilities, Infrastructure and Risk Management (FIRM)

Facilities Management & Campus Services

 

TO:  Shutdown Group, Gates, Doherty, Purnell, Building Access

FROM:  Service Response Center

SUBJECT: Gates, Doherty, Purnell Power Shutdown for Electrical Maintenance Work


A preliminary planning meeting was held on Wednesday, 2/19, to discuss a power shutdown that will affect Gates, Doherty and Purnell. The shutdown is necessary to perform maintenance in each building. 

The proposed date for the 12-hour power outage is 5/31.  An update will be sent when this date is confirmed.

Emergency generators will be running if you have equipment on emergency power. 


ALL THREE BUILDINGS WILL BE CLOSED DURING THE OUTAGE.

Please contact Bob Penn, FMS Metering and Automation Systems Engineer, at 412-251-2658 or rpenn@andrew.cmu.edu for any questions or concerns regarding these shutdowns.