Sun. Oct 5th, 2025

REMINDER – There will be a meeting tomorrow, 7/25, at 9:30AM in the FMCS 2nd Floor Conference Room to discuss details of the upcoming power shutdowns that will affect Warner, Cyert, Baker and Porter Halls. 

 

If you have not done so already, please send an email to Shannon Wetzel at swetzel@andrew.cmu.edu if you plan to attend this meeting.

 

 

 

There will be a meeting on Wednesday, 7/25, at 9:30AM in the FMCS 2nd Floor Conference Room to discuss details of the upcoming power shutdowns that will affect Warner, Cyert, Baker and Porter Halls.  This power shutdown is currently scheduled for Saturday, 8/11.

 

Please send an email to Shannon Wetzel at swetzel@andrew.cmu.edu if you plan to attend this meeting.

 

 

 

The below email is being resent to include the Warner Hall and Cyert Hall email distribution lists.

 

 

From: FMS Announce
Sent: Monday, July 2, 2018 8:53 AM
To: ‘FMS Announce’ <fmsannc@andrew.cmu.edu>; ‘fms-shutdown@lists.andrew.cmu.edu’ <fms-shutdown@lists.andrew.cmu.edu>; ‘fms-porter@lists.andrew.cmu.edu’ <fms-porter@lists.andrew.cmu.edu>; ‘fms-baker@lists.cmu.edu’ <fms-baker@lists.cmu.edu>
Subject: Warner, Cyert, Baker & Porter Halls Power Shutdowns 8/11

 

Division of Operations

Facilities Management and Campus Services

 

TO:  Shutdown Group, Baker Hall, Porter Hall

FROM:  Service Response Center

DATE:  July 2, 2018

SUBJECT: Warner, Cyert, Baker & Porter Halls Power Shutdowns 8/11

 

A power shutdown is tentatively scheduled for Warner, Cyert, Baker and Porter Halls on Saturday, 8/11, from 4:00AM – 11:59PM.  This shutdown is necessary in order to continue work on the 2 circuits for those buildings.

 

Cyert Hall is expected to be without power during the whole shutdown.  Warner, Baker and Porter Halls will have two shutdowns during this timeframe for approximately 3-4 hours towards the end of the overall shutdown.

 

For questions or concerns regarding this, please contact Lenny Libbon at x8-6148 or email LL1R@andrew.cmu.edu.

 

 

From: FMS Announce
Sent: Tuesday, June 5, 2018 6:52 AM
To: ‘FMS Announce’ <fmsannc@andrew.cmu.edu>; ‘fms-shutdown@lists.andrew.cmu.edu’ <fms-shutdown@lists.andrew.cmu.edu>; ‘fms-porter@lists.andrew.cmu.edu’ <fms-porter@lists.andrew.cmu.edu>; ‘fms-baker@lists.cmu.edu’ <fms-baker@lists.cmu.edu>
Subject: Baker/Porter Hall Power Shutdown 6/9 5:30AM-5:30PM

 

Division of Operations

Facilities Management and Campus Services

 

TO:  Shutdown Group, Baker Hall, Porter Hall

FROM:  Service Response Center

DATE:  June 5, 2018

SUBJECT: Baker/Porter Hall Power Shutdown 6/9 5:30AM-5:30PM

 

The power to Baker and Porter Halls will be off on Saturday, 6/9, from 5:30AM – 5:30PM in order to continue work on the 2 circuits for those buildings.

 

For questions or concerns regarding this, please contact Lenny Libbon at x8-6148 or email LL1R@andrew.cmu.edu.

 

 

 

 

UPDATE – There will be a 4 hour power shutdown affecting Warner, Cyert and Porter Halls on Friday, 4/6, starting at 8:00PM. 

 

There will also be a 2 ½ hour power shutdown on Saturday, 4/7, starting at 3:30PM that will only affect Baker Hall.

 

During these shutdowns, work will be done on the high voltage power to all four buildings in order to make the final connections.

 

Please contact Bob Penn for any questions or concerns at rpenn@andrew.cmu.edu or 412-251-2658.

 

 

 

UPDATE – Repairs to the high voltage electrical equipment serving Baker Hall, Porter Hall, Warner Hall and Cyert Hall will be ongoing.  Occupants should expect additional power shutdowns to one or more of the affected buildings.  Updates will be sent when those shutdowns are scheduled to occur. Every attempt will be made to schedule these planned outages to minimize disruption of academic and research programs.

 

The emergency generator providing power to Baker Hall will remain through next week with expected repairs completed the week of April 2nd

 

Please contact Bob Penn for any questions or concerns at rpenn@andrew.cmu.edu or 412-251-2658.

 

 

From: FMS Announce
Sent: Wednesday, March 21, 2018 1:17 PM
To: ‘FMS Announce’ <fmsannc@andrew.cmu.edu>; fms-shutdown@lists.andrew.cmu.edu; fms-porter@lists.andrew.cmu.edu; fms-baker@lists.cmu.edu; fmsfcc-all@lists.andrew.cmu.edu
Subject: RE: UPDATE – Baker Hall Planned Power Outage 3/22 at 11PM until 5AM on 3/23

 

UPDATE – There will be a power shutdown in Baker Hall starting tomorrow, 3/22, at 11:00PM until 5:00AM on Friday, 3/23.  This shutdown is necessary in order to test the high voltage electrical equipment serving Baker Hall.

 

 

From: FMS Announce
Sent: Sunday, March 18, 2018 4:48 PM
To: fms-shutdown@lists.andrew.cmu.edu; fms-porter@lists.andrew.cmu.edu; fms-baker@lists.cmu.edu; fmsfcc-all@lists.andrew.cmu.edu
Subject: RE: UPDATE – Baker Hall Planned Power Outage 8:00 AM – Noon Sunday

 

UPDATE – The replacement generator arrived on site at 4:45.  We plan to turn power off shortly after 5:00 PM and should have power restored by 7:00 PM.

 

UPDATE:  The time for the power shutdown in Baker Hall tomorrow (Sunday, March 18th) has been changed to 12:30pm to 4:30pm.

 

 

UPDATE – All power will be shut off in Baker Hall tomorrow (Sunday, March 17th) from 8:00 AM to Noon to replace the generator installed last night with a quieter model to minimize disruption to campus.    

 

 

From: FMS Announce
Sent: Saturday, March 17, 2018 2:24 PM
To: fms-shutdown@lists.andrew.cmu.edu; fms-warner@lists.andrew.cmu.edu; fms-cyert@lists.andrew.cmu.edu; fms-porter@lists.andrew.cmu.edu; fms-baker@lists.cmu.edu; fmsfcc-all@lists.andrew.cmu.edu
Subject: UPDATE – Planned Power Outage for tonight is postponed

 

UPDATE – The shutdown originally scheduled for tonight Saturday) at 6:00 PM has been postponed.  Occupants should continue to expect additional shutdowns in the coming week or so to one or more of the affected buildings at a time.  A Baker Hall shutdown may occur as soon as midday tomorrow (Sunday) and is expected to last 3-4 hours.  Exact timing of that shutdown will be posted as soon as shipping schedules can be more precisely determined.

 

UPDATE – Power has been restored to all circuits in Baker Hall using the temporary emergency generator.

 

Making final repairs will require multiple power interruptions to all 4 buildings and, potentially to other buildings on campus.  Every attempt will be made to schedule these planned outages to minimize disruption of academic and research programs.   Investigations will continue throughout the weekend.  Updates will be sent out as plans solidify.

 

UPDATE – Electrical service has been restored to Cyert Hall, Warner Hall and Porter Hall.  Baker Hall is still without power.  The high voltage cable failures to the electric lines serving Baker Hall damaged both the primary and secondary electric service to Baker Hall. An emergency generator has been brought in to provide temporary power to Baker Hall while repairs proceed on regular service to the building.  The temporary power connection to Baker Hall is expected to be completed later today.

 

Additional updates will be sent out later today.

 

UPDATE – Failure in circuits to the following buildings in preparation for the planned shutdown has resulted in power disruption.  Work is being done now to restore power.  Repair is expected to take several hours and may not be restored until later tonight.

 

Cyert, Warner, Baker and Porter are affected by this power disruption.

 

 

Please contact Bob Penn for any questions or concerns at rpenn@andrew.cmu.edu or 412-251-2658 or Martin Altschul, ma3q@andrew.cmu.edu.

 

 

UPDATE – In order to complete additional work identified in last weekend’s shutdown, a 6 hour power shutdown has been scheduled for this Saturday, 3/17, starting at 6:00PM until midnight.  This shutdown will affect Warner, Cyert, Porter and Baker Halls.  Access to the buildings will be prohibited during this time.

 

The planned work includes an initial phase that will last approximately two hours – if that work is successful, power will be restored before midnight.  If the initial phase identifies additional issues with the high voltage cables, then additional testing will be completed within the full 6 hour power shutdown.

 

This shutdown is weather dependent and will be postponed if temperatures are judged to be too cold.  The current forecast is within acceptable temperature ranges.

 

Please contact Bob Penn for any questions or concerns at rpenn@andrew.cmu.edu or 412-251-2658.

 

 

 

UPDATE – The 12 hour power shutdown on Friday night was completed, however testing of the existing cables identified issues that will require additional work.  FMS is consulting with high voltage experts to determine the best options to complete the needed repairs.  More information will be provided in future updates.

 

 

REMINDER – There will be a 12 hour power shutdown affecting Warner, Cyert, Baker and Porter Halls starting at 6:00PM on Friday, 3/9, until 6:00AM on Saturday, 3/10.  Access to these buildings will be prohibited during this time.

 

 

 

UPDATE – The 3 hour power shutdown that occurred on Sunday, 3/4, went well and allowed us to prepare for the 12 hour power shutdown that is scheduled for this Friday, 3/9, starting at 6:00PM.  This shutdown will continue until Saturday, 3/10, at 6:00AM.  This is necessary to repair and restore normal service to Warner, Cyert, Baker and Porter Halls.  Access to these buildings will be prohibited during this time.

 

This shutdown is weather dependent and will be postponed if temperatures are judged to be too cold.  A notice will be sent if this needs to be cancelled.  We are tentatively looking at Friday, 3/16, into Saturday, 3/17, as the back-up days if this needs to be rescheduled. 

 

Please contact Glenn Gross for any questions or concerns at gg2q@andrew.cmu.edu or 412-268-2276.

 

 

 

UPDATE – The 3 hour power shutdown scheduled from 1:00AM – 4:00AM this Sunday, 3/4, will remain the same.  The 12 hour shutdown will now occur on Friday, 3/9, starting at 6:00PM and will last through Saturday, 3/10, at 6:00AM. 

 

Please contact Glenn Gross for any questions or concerns regarding the shutdowns at gg2q@andrew.cmu.edu or 412-268-2276.

 

 

 

Division of Operations

Facilities Management and Campus Services

 

TO:  Shutdown Group, Warner, Cyert, Baker, Porter

FROM:  Service Response Center

DATE:  March 1, 2018

SUBJECT: 3 Hour Power Shutdown 3/4 1AM-4AM

 

There will be a 3 hour multiple building power shutdown on Sunday, 3/4, from 1:00AM – 4:00AM and will affect the following buildings:

 

          Warner Hall

          Cyert Hall

          Baker Hall

          Porter Hall

 

This shutdown is necessary in order to repair one of the high voltage cables serving Porter Hall that experienced a critical failure in a manhole on the Mall earlier last month. 

 

This will be the first of two shutdowns necessary to repair and restore normal service to the buildings listed above.  The second power outage is currently scheduled to occur on Saturday, 3/10, starting at 9:00PM and will last through Sunday, 3/11, at 10:00AM.  More details regarding this second shutdown will be sent following the initial shutdown.

 

Please contact Glenn Gross for any questions or concerns at gg2q@andrew.cmu.edu or 412-268-2276.