SUBJECT: SEI Partial Chilled Water Shutdown 9/26

 

There will be a partial chilled water shutdown in SEI tomorrow, 9/26, from 6:00AM – 10:00AM.

 

During this time, CDFD will be relocating some hot water and chilled water piping in the south east corner of the SEI Cafeteria  This work is a part of the SEI Cafeteria HVAC Project and is necessary in order to install the relief fan and duct work.

 

The areas affected in SEI are limited to the fan coil units located on the south east end of the second floor.

 

For any questions regarding this shutdown or the SEI Cafeteria HVAC Project, please contact Kevin Ford, CDFD Project Manager, at 412-268-7853.