SUBJECT:  Porter Hall Main Entrance Exterior Masonry Repointing 8/7 – 8/23

 

The Porter Hall main entrance, from Frew Street, will have masonry repointing performed starting tomorrow, 8/7 through 8/23.  This work extends to both the A level and the 1st floor exterior entrance and will replace the joint sealants between the granite blocks as well as some brick replacement.

 

Areas will be blocked off in sections for this work.  Egress will be maintained from one side or the other at all times.

 

For questions or concerns regarding this work, please contact Ron Cunningham at rcunning@andrew.cmu.edu or x8-1556