Due to freezing temperatures and a cracked window, a heating line failed in Baker/Porter on the 3rd floor in the 354 Suite. This water line break has impacted the floors below it. See below and attached floor plans for impacted areas:
· 3rd Floor: 354
· 2nd Floor: 254
· 1st floor: 154
· A Level: A53
The line is isolated, crews are on site to begin repairs and our water damage response team is beginning to dry out areas.