Facilities, Infrastructure and Risk Management (FIRM)
Facilities Management & Campus Services
TO: Shutdown Group, UTDC
FROM: Service Response Center
DATE: August 21, 2023
SUBJECT: Tech Street Sidewalk Repair 8/22-8/23/2023
PWSA has scheduled repairs to the sidewalk on Tech Street by the HOA/ Posner loading dock for tomorrow and Wednesday. Pedestrians should avoid Tech Street during these 2 days given that sidewalks on both sides of the street will be affected by construction. Pedestrians needing to go between Main Campus and Frew Street should use the sidewalks by the Peace Garden and between Baker Hall and Hunt Library, instead.
For further information, please contact Thom Thornton at tt2g@andrew.cmu.edu, (412) 316-6244.
