REMINDER AND UPDATE – Tech Street will be closed from 6AM – 6PM starting tomorrow, 8/31, and Thursday, 9/1. This closure will enable crane assembly for the ongoing Highmark Center for Health, Wellness…
REMINDER AND UPDATE – Tech Street will be closed from 6AM – 6PM starting tomorrow, 8/31, and Thursday, 9/1. This closure will enable crane assembly for the ongoing Highmark Center for Health, Wellness…
UPDATE – The 24-hour power outage required to connect Scaife Hall to the campus high voltage electrical system has been postponed two weeks from September 17-18 to October 1-2 due…
UPDATE – The 24-hour power outage required to connect Scaife Hall to the campus high voltage electrical system has been postponed two weeks from September 17-18 to October 1-2 due…
UPDATE: The air handler is expected to be back in service by the end of next week. We do not anticipate that any space temperatures in the building will be…
UPDATE: The return to service date of this air handler has yet to be determined due to parts being unavailable. We will update again once we have a delivery date…
RESCHEDULED – Due to conflicting schedules, this shutdown will be rescheduled for the week of 10/17 – 10/22 during Fall Break. A reminder will be sent closer to those dates. …
Facilities, Infrastructure and Risk Management (FIRM) Facilities Management & Campus Services TO: Shutdown Group, GATF FROM: Service Response Center DATE: August 24, 2022 SUBJECT: 4615 Forbes Ave-GATF Building Level 1 Power…
UPDATE – TCS Hall domestic water will also be impaired during the GATF water valve replacement. The fire service for TCS should not be interrupted. The water outage for…
UPDATE – The 48 hour steam shutdown scheduled for this Friday, 8/26, and Saturday, 8/27, has been postponed until a later date. An updated notice will be sent when the shutdown is rescheduled. …